🏡 Planning Your Landed Home Rebuild: A Step-by-Step Guide (2025 Edition)
- Hitomo Construction Singapore (2010) Pte Ltd
- Jul 3
- 1 min read
🔹 Step 1: Assess Your Site and Intentions
Do you want to rebuild, extend, or A&A?
Check your site’s GFA, zoning, and URA envelope control
Common mistakes: ignore drainage reserve and AMSL levels
🔹 Step 2: Engage a Design & Build Team Early
Why separating designer and builder = risk of misalignment
Hitomo’s approach: Architect + Builder collaboration from Day 1
Avoid “rework” caused by impractical designs
🔹 Step 3: Submit for Authority Approvals
Who submits what: QP handles URA/BCA/SCDF/PUB
Typical submission timeline: 2–4 months
Don’t forget: drainage clearance, tree protection plans, ECM
🔹 Step 4: Demolition and Site Prep
Temporary power, water, hoarding, toilets
Hacking + haulage plan approval
Site marking for boundary, platform level
🔹 Step 5: Foundation & Structural Works
Soil investigation if needed
RC footing or pile foundation
BCA / RTO stage inspections
🔹 Step 6: Build-Up and Roof Works
Superstructure framing
M&E rough-in (conduits, plumbing, drainage)
Waterproofing critical checkpoints
🔹 Step 7: Internal Works & Finishing
Flooring, tiling, carpentry, windows, painting
Electrical/lighting fittings
What delays handover most: carpentry + door / window / glass orders
🔹 Step 8: TOP, CSC & Handover
URA approval
PUB drainage + sanitary approval
NParks / LTA / NEA approval
BCA As Built Structural + Barrier approval
BCA HS approval
BCA Overall TOP submission → move-in → CSC clearance
✅ Hitomo’s Value at Every Stage:
Phase | Hitomo Support |
Design | In-house QP collaboration |
Submission | Full coordination with URA, BCA, SCDF |
Construction | Class 1 builder supervision + visual tracking |
Handover | Final defect clearing + authority liaison |
📞 Ready to Start Your Rebuild?
Whether it’s your first landed rebuild or a fresh start after past delays, Hitomo Construction can help you rebuild with confidence.